Ellesmere

Okay so internet coverage is not going to be too consistent down this canal, maybe Orange haven’t got this far out. We have arrived at Ellesmere but have yet to go into the town. The Llangollen canal is in need of some serious dredging, there is no room for two boats to pass without one of them, usually us, running aground, our draught is 2 foot 3 inches so let us hope that we can make it to the end of the canal.

We had a quick dip into Wales but I think that we are now back in England not sure when we came back into England.

Yesterday we did 8.42 Miles 9 Locks and 4 lift bridges

Today we did 8.25 miles and 1 lift bridges

Statistics so far:-

1135.24 Miles, 773 Locks, 74 Swing Bridges, 55 Lift Bridges, 10 Tunnels

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: